Aluminum Stamping & Forming of a Wind Veil Flapper for the Architectural Industry

In addition to our national client base, North Central Stamping & Manufacturing, Inc. maintains a strong local presence and is a proud contributor to many architectural projects in the area. We were pleased to participate in the construction of Target Stadium, which opened in 2010 as the new home to the Minnesota Twins baseball franchise. Ranked by ESPN Magazine as one of 2013’s top 20 baseball stadium experiences in North America, this 39,021-seat open-air ballpark features a façade constructed from local limestone and is noted for being awarded LEED Silver Certification by the U.S. Green Building Council.

Chosen as the supplier of the wind veil flappers shown here, we developed a stamping process to form the 5052 aluminum components, which featured dimensions of 5.00” in length, 5.00” in width, and 0.20” in thickness. We utilized a bright dip process to create the glossy appearance and chemically polish the surface for an enhanced visual appeal. Low cost tooling made this large order of 55,000 pieces very economical, and we completed it within a 6 week timeframe.

If you would like more information about this project or any of our services, please contact us today.

WE HAVE THESOLUTIONRequest a Quote!

Wind Veil Flapper Project Highlights

Project Name
Wind Veil Flapper
Project Description
This wind veil flapper is used as an architectural component.
Capabilities Applied/Processes
Primary:
Stamping
Forming
Secondary:
Coating
Equipment Used to Manufacture Part
Punch Press
Overall Part Dimensions
Length: 5.000”
Width: 5.000”
Tightest Tolerances
.005”
Material Used
5052 Aluminum
Material Thickness
.020”
Material Finish
Bright Anodize
Industry for Use
Architectural
Tooling Cost
$3,800
Volume
55,000
Packaging
Bulk
Delivery/Turnaround Time
4-6 weeks
Delivery Location
Minneapolis, Minnesota
Standards Met
MIL-A-8625